![]() |
|
|
||
|
|
|||
LDH
Testing September
19, 2007 On Wednesday's work night, a crew
took on the task of testing the LDH( 5 inch hose) on Engine 23-3.
Crews started by having junior members John Morris and Lauren Sullivan
wrap the hydrant while the engine drove away. Once all 1300 feet of
hose were laid, the end was connected to the truck. The junior members
then charged the line and pressure was placed on the line. After counting
and checking each coupling the hose was then packed back in the hosebed
to be used another time.
|
||||